Import-Export Bulletin Board Shandong Speed Steel Seiko Factory Co., Ltd. Logo

Home > Offers to Sell > Chemicals & Plastics > Adhesives & Sealants > Silicone Sealants

Contact: SpeedSteel
Company: Shandong Speed Steel Seiko Factory Co., Ltd.
Huangdao District, Qingdao, Shandong (Room 2001-1, No. 230 Changjiang Middle Road, Development Zone)
shandong 266555
China
E-Mail: Send Inquiry Member for over 1 year
Date/Time:  12/26/22 3:13 GMT
 

Boiler Slag Removal System

The slag well is mainly used for the transition connection between the boiler
and the slag dryer. When the slag dryer is in normal operation, it is in the
shape of a conical funnel. When the slag dryer is in an accident state, the
hydraulic shut-off door at the bottom is closed to form a conical container to
store a certain amount of slag.

Boiler Slag Removal System Parameter

Product name Boiler Slag Removal System
Material The slag well is equipped with refractory materials and thermal
insulation materials, and the steel structure and refractory materials should
be able to withstand the direct impact of large pieces of slag. The refractory
material contains corundum component.
Application It is used in boiler slag discharge system to store ash and
slag when the slag machine has an accident or is overhauled.
Price term EXW, FOB, CIF, CFR, CNF, etc.
Payment L/C,T/T,Western Union,etc.
Port Delivery Qingdao, Shanghai, Tianjin, Shenzhen,etc.
Heat Resistance Can withstand high temperature of slag above 900℃

Structure of Boiler Slag Removal System
The slag well is equipped with manhole doors, peep holes, coke holes,
inspection holes, walkways and escalators. The upper part of the slag well is
connected with the water sealing plate of the lower header of the boiler, and
the lower part is connected with the shut-off door of the slag well, and the
supplier ensures that the bottom of the furnace is sealed. The lining of the
slag well has impact resistance and has a lifespan of not less than 100,000
hours.

Application of Boiler Slag Removal System
The main function is to store ash during slag machine accidents or maintenance;
when the slag machine is in normal operation, the slag well is the channel for
slag dropping.

Usage Instruction for Boiler Slag Removal System
The slag well has a storage capacity of not less than 4 hours of slag discharge
under the MCR condition. The slag well is usually supported by an independent
support type. When an independent support type is used, there should be enough
space for the lower slag fishing machine to be pulled out horizontally for
maintenance. The slag well water seal tank can effectively absorb the vertical
and horizontal expansion of the boiler water wall, and the water seal tank is
provided with flushing and sewage measures. When the suspended installation is
adopted, there is no water sealing groove, but the expansion of the boiler is
absorbed by the lower equipment. The water sealing groove of the slag well is
arranged around the slag well, and the water level in the tank and the sealing
of the slag hopper are maintained by the continuously overflowing sealing
water, and a cooling water spray device is arranged in the slag well.

As a professional metalworking factory, we provide sand casting, steel sheet
pile, brass casting, etc. For more information, please feel free to contact us!

Minimum Order: 1 sets

Boiler Slag Removal System
Enlarge Click to Enlarge
SOURCE: Import-Export Bulletin Board (https://www.imexbb.com/)
Report Abuse

Post an Offer to Sell

© 1996-2010 IMEXBB.com. All rights reserved.

IMEXBB.com