|
Home > Offers to Sell > Tools & Hardware > Mechanical Hardware > Valves
Contact: |
VINSON ZHANG |
Company: |
AAK INDUSTRY CO., LTD |
|
Bona Business Building, No. 456 Taikang Middle Road |
|
Ningbo 315100 |
|
China |
Phone: |
057483008115 |
Fax: |
057488138441 |
E-Mail: |
|
|
|
Date/Time: |
1/22/24 2:38 GMT |
|
|
AAK Hydraulic valve blocks German quality, Cheaper Price, Faster Delivery
AAK hydraulic valve blocks are processed with compound cutting tools, and the production efficiency is nearly 50% higher than that of peers. At the same time, the precision of hydraulic valve blocks is also improved by 5%. AAK completed the urgent order of 1,000 hydraulic valve blocks in only 30 days, while most hydraulic valve block manufacturers can't control the processing technology of compound cutting tools. German customers are also attracted by it.
It's a little strange that since the second half of last year, many inquiries about hydraulic valve blocks have an urgent delivery date. They need to be shipped within 20 days or finished within 30 days. For non-standard hydraulic valve blocks, from production drawing design, sample, life test, production to delivery, the vast majority of hydraulic valve block manufacturers need 45-60 days. But this is desperate for the customers with urgent order of hydraulic valve blocks, and Bach in Germany is one of them.
Bach wanted to purchase 1,000 pcs of hydraulic valve blocks a few weeks ago. His customer requested that the goods be delivered to Germany in 50-60 days, but the quotation of the local factory in Germany exceeded his budget. He could only find the manufacturer of hydraulic valve blocks in Ningbo, that is, goods need to be shipped in 30 days. Bach contacted nearly 20 hydraulic valve block manufacturers, but none of them can complete the production of 1,000 hydraulic valve blocks in 30 days.
A few days ago, we received Bach's message on AAK website (www.aakindustry.com): I saw an article on B2B that "AAK processes hydraulic valve blocks with compound cutting tools, and the delivery time is 30 days faster than peers". Can AAK complete non-standard hydraulic valve blocks in 30 days? After communication, I learned that Bach was troubled by the delivery date of hydraulic valve blocks. I directly told him that the 30 days of lead time for 1,000pcs of hydraulic valve blocks is enough for AAK.
AAK adopts the compound cutting tool processing technology that most hydraulic valve block manufacturers can't control, that is, combining two or more similar or different types of hole processing tools into a special composite tool. In the process of machining, reduce the tools required for machining X, Y, V and U partial views, and complete the process combination of multiple processes such as drilling, reaming, spot facing and boring. At the same time, one tool can simultaneously process threaded bottom holes, 45 °, 15 °, R0.1 chamfering and external counterbore, which greatly improve the processing efficiency and have the characteristics of high efficiency, high precision and high stability. This is the "trump card" of AAK to improve the production efficiency. The production efficiency is nearly 50% higher than that of its peers. At the same time, the precision of hydraulic valve blocks is also increased by 5%.
Five days later, the hydraulic valve block sample was successfully sent out. Less than a week later, Bach told AAK that the test results of the hydraulic valve block made him admire. The technical parameters of AAK hydraulic valves have caught up with the local factory in Germany, but the price is 30% cheaper, and the delivery is more than 30 days faster. The sample was approved for mass production at the first time, and the hydraulic valve blocks were shipped smoothly after 30 days.
AAK hydraulic valve blocks, processed with compound cutting tools are not only fast, high precision but also stable. You are welcome to try the order.
https://www.aakindustry.com/info-det , ail/hydraulic-valve-blocks-aak217
Click to Enlarge
SOURCE: Import-Export Bulletin Board (https://www.imexbb.com/)
Post an Offer to Sell
© 1996-2010 IMEXBB.com. All rights reserved.
|
|