|
Home > Offers to Sell > Minerals & Metals > Machinery & Parts > Mining Machinery
Contact: |
Ben |
Company: |
HNYT Equipment Co., Ltd. |
|
No. 2, Fuzhou Road, Jiuhua Industrial Park, Jiuhua Economic Zone |
|
Xiangtan/Hunan 411100 |
|
China |
Phone: |
17369222201 |
Fax: |
86 - 731 - 58528855 |
E-Mail: |
|
|
|
Date/Time: |
10/19/24 8:40 GMT |
|
|
7 ton Mining Trolley Locomotive for Copper Mine
7 ton Mining Trolley Locomotive for Copper Mine
The model has two kinds of working rated voltage:250v and 550V. It applies primary driving way, speed control of IGBT chopping wave type or resistor type or VF type. Main fetures include:short wheel base, high stiffness of vehicle body, and good shockproof performance. The braking type is mechanical or electric braking. Both mechanical braking and electric brking have safe and reliable effect.
Adhesive / total weight (t) : 7 ton Track gauge (mm) : 600.762.900 Traction (KN) : 13.05 15.09 Max. Traction (KN) : 17.2 Speed(km/h) : 11 Power (KW) : 21X2 24X2 Dimensions Length(mm) : 4550 Width(mm) : 1050,1212or 1350 Height(mm) : 1600 Wheelbase (mm) : 1100 Wheel diameter (mm) : 680 Min Curve radius (m) : 7 Controller : Resistencia or IGBT Braking method : Mechanical
Advantages of our product
1.Using high-quality steel plates, special rust removal process make sure it more anti-corrosion and suitable for harsh mining environment. 2. Producing motors ourselves, using high lever insulation material and pure copper, ensure the powerful traction force, and suitable for harsh mining environment. 3.Gear anastomosis surface to reach more than 80%, which is far more exceeding the standard. 4.Professionally designed and adjusted frame ensure safe driving and avoids falling off rails. 5.A variety of braking methods can be choose, air brake, hydraulic brake, electric brake, mechanical brake to ensure the safety drive. 6. 40 years richful experience with the ability to design and make customized product according to your requirements. 7. Proving factory online-visiting
Factory Test Mining Locomotive test 1.Before Running the locomotive,carry out gear debugging, lighting, gear, and brake adjustment etc.To ensure the normal operation of the locomotive. 2.Carry out a tensile test before leaving the factory to ensure the load performance of the locomotive meets the standard. Our design standards generally exceed the national standard by 10%-20%. 3.Carry out different type running test before leaving the factory to ensure the performance and normal operation of the whole locomotive. It can adapt to various harsh conditions under simulated working conditions. Motor test The motor has to go through many inspection procedures before leaving the factory, and each motor has to be carried out with load running experiments. Explosion-proof motors are carried out with water pressure test. All the test of motor is to ensure that can adapt to harsh working conditions.
Minimum Order: 1 sets
Click to Enlarge
SOURCE: Import-Export Bulletin Board (https://www.imexbb.com/)
Post an Offer to Sell
© 1996-2010 IMEXBB.com. All rights reserved.
|
|